Williamsburg Works Interim Remedial Measure
The Pre-Design Investigation field work for the 50 Kent Avenue Interim Remedial Measure (IRM) includes the installation of soil borings, monitoring wells, and test pits to gather information required to determine the design parameters of the interim remedial measure at the 50 Kent Avenue parcel of the Williamsburg Works MGP Site.
Activities Week of March 12 - March 16, 2012
Continued drilling of delineation borings. Began test pit excavations.
Future (Two Week Look-Ahead) Activities
-
March 19 – March 23 - Drilling of delineation borings will continue. If completed, drilling of geotechnical evaluation borings will begin. Test Pitting will continue.
-
March 26 – March 30 – Completion of test pitting and geotechnical evaluation borings. Commence installation of monitoring wells.