Weekly Update, Week Ended April 05, 2013

Williamsburg Works Interim Remedial Measure

The Supplemental Pre-Design Investigation field work for the 50 Kent Avenue Interim Remedial Measure (IRM) includes the advancement of soil borings to gather information required to determine the design parameters of the interim remedial measure at the 50 Kent Avenue parcel of the Williamsburg Works MGP Site.

Activities Week April 1 – April 5, 2013

Installed soil borings to collect geotechnical data and visually log MGP materials.

Future (Two Week Look-Ahead) Activities:

Continue installing soil borings to collect geotechnical data and visually log MGP materials.